Our Survey Services in UAE
The Arabian Surveying Engineering LLC is an ISO 9001:2015 certified land and engineering survey company serving Dubai, Ras Al Khaimah and the whole UAE since 2017. From topographic surveys and GPS RTK control points to building and infrastructure setting out, earthwork volume calculations and GPR utility detection, our experienced survey teams deliver accurate data for contractors, consultants and developers. Choose a service below or contact us for a quote.
• Land & Engineering Surveys
Topographic Surveys
Existing buildings & Structures
Ground Surfaces
Oil & Gas Field
MEP Detail Survey for Buildings
• Building Construction Surveys
Setting out Survey
Vertical and lateral monitoring of high-rise construction
Horizontal & Vertical Alignment Fixing for aluminium cladding works
• Infrastructure Construction Surveys
Setout of Road Lines, Rail Lines & utility Services
Right-of-Way
Underground Utilities Survey
Ground Penetrating Radar (GPR)
• Measurement Surveys
Earthwork volume Calculations
Stoke pile volume
• Control Point Establishment
Static and RTK method by GPS
• GIS Surveys
Ground Penetrating Radar
Electromagnetic Survey
• Hiring of Survey Crews
Professional Land Surveyors with / without Instruments on yearly, monthly & daily basis
