Most arguments about a survey start after the crew has packed up. The fieldwork was fine, but the drawing arrives as a PDF nobody can edit, the coordinates sit on a grid the designer does not use, or the levels carry no stated datum. All of that comes down to survey deliverables: the files and documents you actually receive, and whether they were agreed before work began.
This guide walks through the deliverables that contractors, consultants and developers in the UAE most often need, what each one should contain, and how to word the request so nothing is left to assumption.
Why survey deliverables should be agreed before fieldwork
A survey crew collects what the scope tells it to collect. If the scope says only “topographic survey of the plot”, the surveyor has to guess the level of detail, the grid, the contour interval and the file format. Some of those guesses can be corrected in the office afterwards. Others cannot: a feature that was never picked up on site is not in the data, and getting it means sending a crew back.
Three questions settle most of it. Who will use the data: an architect, a road designer, a quantity surveyor, an authority reviewer? What software will they open it in? And what decision does the survey support: design, setting out, a payment claim, a handover? Answer those and the deliverables list almost writes itself.
The core deliverables and what each should contain
1. CAD drawing (DWG or DXF)
The CAD file is the working deliverable. It should be editable, drawn in real-world coordinates rather than shifted or scaled to fit a sheet, and organised into sensible layers so the design team can switch buildings, levels, services, vegetation and boundaries on and off. Spot levels should be readable and, where the designer needs them, held as true 3D points rather than flat text.
Ask for a title block that states the coordinate system, the level datum, the survey date and the control points used, plus a legend for every symbol and line type. If earthworks or drainage will be designed from the survey, say so: the designer will usually want a 3D surface model as well as a 2D plan. Our land and engineering survey service covers topographic work of this kind.
2. Coordinate list (CSV, Excel or text)
A plain table of points: point number, easting, northing, elevation and a short description code. It looks basic, but it is the file a site engineer loads into an instrument for setting out, the file a designer imports when the CAD layers are not what they expected, and the file anyone can use for an independent check. The header should state the coordinate system and units, and control points should be listed separately from ordinary detail points.
3. Level sheets and sections
Where the question is about heights, a drawing alone is rarely the easiest thing to read. Grid level sheets, long sections and cross sections present the same data in the form engineers and inspectors actually sign. If you supply design levels, ask for the sheet to show design level, measured level and the difference side by side. The benchmark used should be named on every sheet.
4. Survey report
A short written report ties the files together: the scope, the dates on site, the method used, the control and datum, the checks carried out, and any limitations. The limitations paragraph is often the most useful part. If a corner of the site was fenced off, stockpiled over or flooded on the day, you want that written down rather than discovered later as a blank patch on the drawing.
5. PDF plots
PDFs are for records, approvals and printing on site. They should be to a stated scale and match the CAD file revision for revision. A PDF is a record of the survey, not a substitute for the data behind it.
Deliverables that change with the type of survey
The five items above are a base. Each kind of survey adds its own outputs:
- Topographic survey: contour plan at an agreed interval, spot levels, all visible features and, if requested, a surface model.
- Setting out: a setting-out record comparing design coordinates with the positions actually marked, and a signed handover of the marks. This is a routine part of building construction surveys.
- As-built survey: an as-built drawing overlaid on the design, with a table of deviations.
- Earthwork and stockpile volumes: the before and after surfaces, the calculation method, section drawings and a quantity summary. See our measurement and volume surveys page for how these are produced.
- Monitoring: periodic reports showing each reading against the baseline, so movement over time is visible at a glance.
- Control points: a station schedule with coordinates and levels, a description or photo of each mark, and a note on whether static or RTK GPS observation was used. More on this under control point establishment.
- Utility detection: a utility plan showing which lines were traced by ground penetrating radar and which by electromagnetic locating, indicative depths where they could be estimated, and any areas that could not be scanned.
Coordinate system and datum: the detail that causes most rework
A survey drawn on an arbitrary local grid can look perfect and still be unusable, because it will not overlay on the plot plan, the neighbouring design or the next survey. Authorities and master developers in the UAE may specify a particular grid and level datum for submissions, and requirements differ from one emirate and one project to another. Check with the relevant authority or your consultant, then write the answer into the survey scope.
Ask for the coordinate system and datum to be printed on every deliverable, not only in the report. If a site grid is used for construction convenience, ask for its relationship to the official grid to be documented so the data can be converted later.
File formats, versions and naming
Small things here save real time. Confirm the CAD version your design team can open and that units are metres. Agree the column order of the coordinate file. Ask for file names that carry the project, the survey type, the date and a revision letter, and for one transmittal that lists every file issued. When a drawing is revised, the change should be noted on the drawing, not just in an email.
Common gaps in survey requests
- The survey extent is described in words (“the plot and surroundings”) with no marked-up plan.
- No contour interval or spot level spacing is given.
- Underground services are assumed to be included when only surface features were requested.
- As-built or level checks are requested, but nobody sends the design drawings to compare against.
- The survey is meant for an authority submission, but the surveyor is not told which authority or which format.
Checklist: what to confirm before the crew mobilises
- Purpose of the survey and who will use the data.
- Survey extent shown on a marked-up plan.
- Coordinate system and level datum, confirmed with the relevant authority or consultant.
- CAD format and version, layer expectations, 2D only or 2D plus 3D surface.
- Coordinate list format and column order.
- Level sheets or sections required, and at what spacing.
- Contour interval and density of spot levels.
- Whether a written report and signed PDF plots are needed.
- Design drawings supplied for any comparison work.
- File naming, revision control and who receives the transmittal.
If you are still choosing a surveyor, our topographic survey company hiring guide covers what to check before you appoint one.
Frequently asked questions
Is a PDF drawing enough?
For a record or a quick site reference, yes. For design, setting out or quantity work, no. Your team will need the editable CAD file and usually the coordinate list as well.
Do I need both a CAD file and a coordinate list?
In most cases it is worth having both. The CAD file shows the site as a drawing; the coordinate list is the raw result that can be loaded into instruments and design software or checked independently. Producing the list adds very little effort when it is requested at the start.
Can deliverables be changed after the survey is finished?
Formats, layers, sheet layouts and sections can generally be reworked from the existing data. Anything that was not measured on site cannot. That is why detail level and extent matter more at the scoping stage than file format does.
Will the deliverables be accepted by the authority?
Requirements depend on the authority and the type of submission, so tell your surveyor at the start what the survey is for. The Arabian Surveying Engineering LLC is an approved survey company with Dubai Land Department (DLD). For any specific submission, confirm the current requirements with the relevant authority.
Get the scope right before the first point is measured
The Arabian Surveying Engineering LLC has worked on 500+ projects for 100+ clients since 2017, is ISO 9001:2015 certified, and serves Dubai, Sharjah, Abu Dhabi, Ras Al Khaimah and the rest of the UAE. Send us your drawings and tell us who will use the results, and we will propose a deliverables list to match. Call +971 55 360 5092, email info@arabianse.com, or send us your survey requirements.