Land Survey Company in Sharjah: What to Prepare Before You Hire

Illustration: Land Survey Company in Sharjah: What to Prepare Before You Hire

Most delays on a Sharjah plot do not come from the survey itself. They come from the week before it: missing plot papers, a locked gate, or a brief that never said which coordinate system the drawings must use. If you are about to appoint a survey company in Sharjah, a short preparation list will save you more time than any rate negotiation.

This guide is written for developers, contractors and consultants who need a land or engineering survey in Sharjah and want the crew to arrive, measure and deliver without a second visit. Arabian Surveying Engineering LLC is based in Al Khuzam, Ras Al Khaimah, and serves Sharjah as part of its work across the UAE, so the points below come from how site work actually runs between emirates.

Start by naming the survey you actually need

Owners often ask for a land survey when they need something narrower, and the wrong name leads to the wrong scope. Before you call anyone, decide which of these describes your situation:

  • Topographic survey: levels, features, existing structures and utilities on the plot, used for design. See our land and engineering surveys.
  • Boundary or plot marking: corners placed on the ground from approved plot data.
  • Setting out: placing building or road positions from approved drawings before work starts.
  • Volume or measurement survey: stockpiles, excavation or fill quantities, covered in our measurement surveys.

If you are unsure, say so. A good crew will ask three or four questions and recommend the right survey instead of quoting the one you named by mistake.

Gather the documents before the first call

A surveyor can only measure what exists on the ground. To place that information correctly, they need the paper trail that describes the plot and the project. Collect the following and send it with your enquiry:

  • Plot or ownership documents showing the plot number and area, as issued by the relevant authority.
  • Any existing site plan, previous survey or CAD file, even if it is old. It helps the crew compare then and now.
  • The design drawings or masterplan extract if the survey will feed a design or a setting out.
  • The coordinate system and datum your design team uses, so deliverables arrive in the right reference.
  • A site contact name and phone number for the day of work.

If you do not know which coordinate system the design uses, ask the consultant before the survey, not after. Re-projecting finished data is possible but it is a wasted step you can avoid.

Sort out site access and safety early

On a Sharjah plot the practical problems are usually simple ones. Is the site fenced, and who holds the key? Is there a developer or master community that needs a permit or a gate pass for outside contractors? Are there other trades already working there? Tell the survey company about all of it when you book, and check with the relevant authority or community management if you are unsure what clearance is required. Do not assume it can be arranged on the morning of the visit.

Clear the plot where you can. Vegetation, debris and parked equipment hide ground detail and slow the crew down. If the plot is large, mark any hazards such as open excavations, loose fill or services you already know about.

Decide what you want delivered

Deliverables are the part of the brief that people leave for last and regret most. Agree these in writing with the survey company before work begins:

Format and content

Ask for a CAD drawing in the format your design team uses, a point list with coordinates and levels, and a PDF for quick review. State the contour interval and the features you need picked up, such as kerbs, manholes, trees, boundary walls and buildings.

Accuracy and reference

State the datum and coordinate system, and ask how the survey will be tied to control points. Reliable control is what makes a survey repeatable, which is why we always start from established points. Our page on control point establishment explains how that works.

Timing

Ask for a field date and a delivery date separately. Field work may be quick, while processing and checking take longer on a large or cluttered site. Treat any date as an agreed target between you and the company, not a guarantee from this article.

What to ask a survey company before you hire

You do not need a long questionnaire. These questions reveal most of what matters:

  • Which of your services fits this plot, and which equipment will you use?
  • How do you check your own measurements before delivery?
  • Who is the contact on site, and who reviews the drawing before it reaches me?
  • Are you an approved survey company with Dubai Land Department if my project also touches Dubai? Arabian Surveying Engineering LLC is, and holds ISO 9001:2015 certification.
  • Can you supply extra crew or instruments if the scope grows? See our survey crew hiring option.

For a wider checklist on choosing a crew, our guide on how to hire a land survey crew in the UAE covers the questions in more detail.

Practical checklist before survey day

  • Survey type named and scope agreed in writing.
  • Plot documents, drawings and any older survey sent to the company.
  • Coordinate system, datum and contour interval confirmed.
  • Site access, gate pass and contact person arranged.
  • Plot cleared of debris where possible and hazards marked.
  • Deliverable formats and delivery date agreed.
  • Person named who will review and approve the drawing on your side.

Frequently asked questions

Do you work in Sharjah if your office is in Ras Al Khaimah?

Yes. Our registered office is in Al Khuzam, Ras Al Khaimah, and our crews work across Dubai, Sharjah, Abu Dhabi, Ras Al Khaimah and the rest of the UAE. Sharjah is a service area for us, not a separate branch.

Can the same company do the survey and the setting out?

Usually yes, and it is often better because the same control points are used for both. Confirm it in the scope so the setting out is tied to the survey you already paid for.

What if my plot has no existing drawings?

That is common. A topographic survey creates the base drawing from scratch, and your designer can start from it. Share whatever plot paperwork you hold so the crew can place it correctly.

How do I know the survey is accurate?

Ask how the work is tied to control, what checks are made before delivery, and what tolerance the deliverable is meant to meet. A clear answer is a good sign.

Talk to the team

If you are planning a project in Sharjah and want a survey scoped properly, send us your plot details and the survey type through our contact page, call +971 55 360 5092 or email info@arabianse.com. Since 2017 we have worked with more than 100 clients on over 500 projects, and we will tell you plainly what the plot needs.