KNOW MORE EQUIPMENTS

Our Survey Equipment

Accurate survey results depend on reliable, well-maintained instruments. Our field teams across Dubai, Ras Al Khaimah and the wider UAE use GPS RTK (GNSS) receivers, total stations, automatic and digital levels, and ground penetrating radar (GPR) and electromagnetic (EM) utility locators. Instruments are checked and calibrated regularly so that topographic, setting-out, control point and volume surveys meet project tolerances.

Need a survey crew with instruments? See hiring of survey crews or contact us for a quote.

Illustration of a land surveyor using a total station
Infographic explaining EDM distance measurement with a total station
GPS base station on a tripod during a control survey
Robotic total stations used for engineering surveys
3D laser scanner for as-built and building surveys
Drone aerial mapping survey planning screen
Surveyor operating a drone for an aerial survey on a construction site
Automatic level on a tripod for levelling surveys
GPS RTK rover poles and survey tripods
Scroll to Top